6/27/14



It's easy to see how much they've grown in three weeks!

Day 21
Irwin #6 Green



Day 17
Irwin #6 Green

Day 1
Irwin #6 Green



Day 21
Sprig Closeup



Day 17
Sprig Closeup

Last Week 6/23/14-6/28/16
  • We mowed the new greens two times this week. Once on Monday and again on Thursday. The first two cuts were at (.200"). Our plans are to incrementally lower the mowers until we reach our desired mowing heigth. With the growth we are getting, we'll be mowing everyday in no time!
  • To continue growth and lateral coverage, the greens were fertilized twice and watered throughout the day.
  • After our Monday mowing, we topdressed the greens with a sand/peat blend. Then dragged in the mix with a brush. The topdressing will help fill the voids and smooth the surface.

Next Week 6/30/14-7/4/14
  • Continue to mow, fertilize and topdress the greens.
  • Re-level and sod forward tee on Irwin #5 and middle tee on Irwin #8 (Photos next week)
  • Slice and spike thin area in the fairways and tees. Also hit with fertilizer for quick coverage.







Wednesday, May 28, 2014

MC Conversion Update - 5/28/14


     The conversion from Tifdwarf to MiniVerde has officially started. We are thrilled to have Day One in the books. Mother Nature blessed us with perfect weather. Mid 80s. Sunny. Breezy. Cleanup after verticutting and aerifying went very well.
     We plan to keep the updates coming along with a recap of we've accomplished. Stay tuned!

     Below are a few photos from yesterday's action. Our goal was to remove as much of the old vegetation as possible.

Adam - verticutting the greens - five different directions!




 

Ed and (Drew in the background) blowing off debris after verticutting





Pushing off plugs after aerifying--two directions.

Saturday, June 30, 2012

PC Conversion Update - 6/30/12

      Water, water, and water some more. That has been the theme at the Players Club over the latter part of the week. We will continue the frequent watering through next week. As the greens become more established, the frequency of watering will decrease and the amounts will increase.
      Along with nursing the greens we were able to accomplish some other goals around the course. Here is a rundown of last week and a look ahead to next.

Last Week 6/24-6/30
  • Planted the MiniVerde sprigs. In case you missed it, here is an overview of the process.
  • Repaired multiple minor irrigation issues around the course. This is a never ending task with 900+ sprinkler heads.
  • Landscaped and sodded the surround of our nursery green. The nursery green is located near our maintenance facility. Here is a picture of that complex.  


  • Cut back some overgrown areas around tees and greens.
  • Applied fertilizer and wetting agent to the bunker faces.
      
Next Week 7/1-7/7
  • Apply fertilizer to the greens. The timing will be based upon their condition. The amount of green tissue at the surface will determine the proper day for fertilization.
  • Roll the greens.*
  • Lightly verticut the greens.*
  • Apply a light topdressing to the greens.*
  • Spray growth regulator on the fairways, tees and rough. This will limit the amount of topgrowth, which in turn reduces scalping and improves overall appearance.
* Tentative based on condition of the greens.

      The greens are currently in a day to day stage. As stated, we are watering frequently and constantly observing their progress. Here are a couple photos of the surfaces Friday.


Above is a photo from eye level. Here you can not see much difference from Tuesday. One change is the the topdressing has settled. This settling has exposed more sprigs to the surface. Although subtle while standing, there are many changes happening at ground level.



Here is a picture from the surface. There is a huge difference when you view the green from this level. You can see the new growth emerging from the sprigs. This was very encouraging to us on Friday. Modern Turf (sprig supplier) told us not to expect any green-up for one week.

      The encouraging green-up ensures us that the conversion is right on schedule. With six weeks until opening, we are confident that the greens will be in excellent condition on August 13th. If you haven't already, come out and see the greens next week. And as always, follow the blog for updates on the conversion and other maintenance projects at St. James.

      One more note with concerns to observing the greens. We run our green's irrigation manually everyday from 6:00-10:30 A.M. and 12:30-4:00 P.M. Our computer system runs the irrigation from 10:30 A.M. until 12:30 P.M. and from 4:00 P.M. until dusk. We are not in control of the cycles during these times. We do not recommend checking on the greens at the times in bold. The best times to stop by and see the greens is from 8:00-10:00 A.M. and 1:00-3:00 P.M.



     

Wednesday, June 27, 2012

PC Conversion Update - 6/27

      The day has finally come and gone. The sprigs arrived around 12:00 on Monday. They came in a refrigerated tractor-trailer. After a short training session, we began planting around 1:00. We were able to complete the back nine (w/pg) around 6:30 Monday evening. We started the front nine at 7:00 Tuesday and finished up on the nursery green at 2:00. Here are some pictures and descriptions of exactly what transpired over the last two days.

      Prior to planting we applied two fertilizers and a pre-emergent herbicide to the greens. The fertilizers were applied to be readily available for the sprigs upon planting. We used a (46-0-0) and  (7-23-19) fertilizer for this application. These fertilizers were selected based on a variety of factors associated with our specific site. The pre-m herbicide was for control of crabgrass and goosegrass. Oxidiazon is the common name of the product we used. This product is the only pre-m that will not interfere with the establishment of new turf.

      Below are pictures describing the various stages of the sprig planting process. The first picture shows a full bag of sprigs as they arrived. These bags are placed all over the surface of the green. We used 15-20 bags per green.




     The bags were then placed onto tarps for opening. The tarp prevented foot and hand marks in the surface from grabbing the sprigs. 




 
 Here is an opened bag dumped atop the tarp. The sprigs were compacted tightly in the burlap sacks, therefore we had to spread the bag over the tarp in order to seperate the sprigs.



 

  This photo shows the laying of the sprigs. It is just as it sounds. We would grab handfuls of sprigs a shake them out all over the surface. This process was similar to spreading bales of straw. 





Below you can see the green take shape. We had roughly 10-15 people per green spreading the sprigs. Each green took approximately 30-40 minutes to spread.







Near completion we began to apply water to the sprigs. This helped to keep the sprigs in place until we could apply water with the overhead irrigation. Below you can see a green in the final stage of sprig laying.





The next step was to slice the sprigs into the surface. We sliced the sprigs in two directions. This process helps to promote good soil to sprig contact. The slicing also helps to keep the sprigs intact on the surface. This theory was tested and proven Monday night. We received two inches of rain and had zero displacement of sprigs.






After slicing, we topdressed the greens. We applied a heavy layer of sand & peat on top of the sprigs. The topdressing provided the sprigs with the proper soil medium to encourage growth. Below you can see a photo of the green being topdressed.




Below is a photo of the topdressed surface. You can see how the sprigs and sand/peat mixture have become incorporated onto the soil surface. 


The final stage in the sprig planting was to roll. The rolling helps in smoothing the surface and promoting soil to sprig contact. Below is a picture of our roller in action.




And then finally, water. Watering, rolling and fertilizer will be our primary focus over the coming weeks. At this point the sprigs need to be treated like seeds. We will apply light amounts of water at frequent intervals to establish the sprigs. At that point we will begin to reduce the frequency of water application.



      After months of preparation and planning, the sprigs have finally been laid. Our focus now shifts to establishment and maintenance of the green surfaces. I encourage all to stop by and check on the new greens. And always, continue to follow the blog for updates on their progress. Also, follow along on Twitter @stjamesturf.