Friday, July 25, 2014


Making our final push at Members Club. The Irwin front greens open next week.

Last Week 7/21/14 through 7/25/14

·        Again, we continued to lower the height on the mowers, making a couple cuts at .130 with the walk mowers.

·        Continued to topdress and fertilize.

·        Edged bunkers, beds and paths.

·        Sodded weakened and bare areas

·        Installed irrigation to alleviate wet approaches

Next week 7/28/14 through 7/31/14

·        Lower the height on Irwin front greens

·        Continue to topdress and roll for smoothness

·        A contractor will treat nematode infested areas such as around Cate #9 tees.

·        Stump removal throughout all three nines at The Members Club

·        Install a repeater to remedy our irrigation broadcast signal issues

·        Scalp, verticut, aerate and fumigate back nine Irwin greens to prepare for MiniVerde sprigging on August 7th.
Tylor rolling #9 Irwin green


Prisim gauge--used to analyze cut

Drew checking out prisim gauge

New sod along path # 1 Irwin
 

No comments:

Post a Comment